Nornickel’s Taimyrsky mine resumed operations from Jun 1 after it was temporarily shut down along with Oktyabrsky mine due to flooding.
The mine is currently operating at 40pc capacity and produces 5,000t (4,535mt) of ore. That said, the mine is expected to reach a full production capacity of 12,100t per day by the end of this month after a gradual ramp up, the company stated.
The total per annum production capacity of the Taimyrsky mine is 4.3mn t, the Russian nickel miner stated.